Retrofit & Up-gradation
Replace outdated panels, wiring, and starters; integrate VFDs and soft starters for 10-30 % energy savings
Upgrade instead of replace—save energy, space, and capex.
We modernise vintage switchgear and drives to today’s safety and efficiency standards.
Scope of Work
Swap out obsolete MCC/PCC sections, wiring harnesses, and DOL starters
Integrate VFDs / soft-starters for pumps, fans, mixers → 10 - 30 % energy cut
Add arc-flash doors, breakers with electronic trip units, and IoT meters
Re-label, test, and certify to IEC 61439 / IS 8623
Implementation Steps
Phase | Output |
---|---|
Site audit | Load profile, harmonics, safety gaps |
Design & ROI model | Payback report, single-line diagram |
Panel build & FAT | Factory test with your spec sheets |
Hot swap install | Weekend / shutdown window |
Measurement & verification | 90-day kWh and PF report |
Proof
Clients recover full retrofit cost in 12-18 months via energy and maintenance savings.